Отрывок: Since the work of enterprise is carried out with different subcontractors, there were considered two examples for testing. The initial data for both of them is given in table 1. Table 1. Initial data for two different subcontractors. Path Path length (Subcontractor 1) Path length (Subcontractor 2) 1 – 2 9 9 1 – 3 12.5 16.5 1 – 4 16 16 1 – 5 22.5 22.5 1 – 6 26 26 2 – 3 6.5 14 2 – 4 23.5 23.5 2...
Полная запись метаданных
Поле DC Значение Язык
dc.contributor.authorFilonov, S.D.-
dc.contributor.authorAksyonov, K.A.-
dc.contributor.authorSmoliy, E.F.-
dc.date.accessioned2019-04-22 11:11:47-
dc.date.available2019-04-22 11:11:47-
dc.date.issued2019-05-
dc.identifierDspace\SGAU\20190421\75674ru
dc.identifier.citationFilonov S.D. Ant algorithms application for factory logistics with multiple waypoint routes / Filonov S.D., Aksyonov K.A., Smoliy E.F. // Сборник трудов ИТНТ-2019 [Текст]: V междунар. конф. и молодеж. шк. "Информ. технологии и нанотехнологии": 21-24 мая: в 4 т. / Самар. нац.-исслед. ун-т им. С. П. Королева (Самар. ун-т), Ин-т систем. обраб. изобр. РАН-фил. ФНИЦ "Кристаллография и фотоника" РАН; [под ред. В.А. Фурсова]. - Самара: Новая техника, 2019. – Т. 4: Науки о данных. - 2019. - С. 428-433.ru
dc.identifier.urihttp://repo.ssau.ru/handle/Informacionnye-tehnologii-i-nanotehnologii/Ant-algorithms-application-for-factory-logistics-with-multiple-waypoint-routes-75674-
dc.description.abstractThe research presented aims to propose a modelling complex for metal-processing enterprise logistics control. In this paper, the application with use of ant algorithms for multiple waypoint route optimization is described. Model equations and flowsheet are proposed along with preliminary experimental data.ru
dc.description.sponsorshipThe work was supported by Act 211 Government of the Russian Federation, contract No 02.A03.21.0006.ru
dc.language.isoen_USru
dc.publisherНовая техникаru
dc.titleAnt algorithms application for factory logistics with multiple waypoint routesru
dc.typeArticleru
dc.textpartSince the work of enterprise is carried out with different subcontractors, there were considered two examples for testing. The initial data for both of them is given in table 1. Table 1. Initial data for two different subcontractors. Path Path length (Subcontractor 1) Path length (Subcontractor 2) 1 – 2 9 9 1 – 3 12.5 16.5 1 – 4 16 16 1 – 5 22.5 22.5 1 – 6 26 26 2 – 3 6.5 14 2 – 4 23.5 23.5 2...-
Располагается в коллекциях: Информационные технологии и нанотехнологии

Файлы этого ресурса:
Файл Описание Размер Формат  
paper52.pdfОсновная статья161.95 kBAdobe PDFПросмотреть/Открыть